Recent work
Before and after, when it is the same spot.
The pair below is the same tub. Other photos are grouped by the kind of work and are not labeled as a finished after unless the picture shows that.
Bathtub reglazing
Same tub. Tape is still on some edges of the finished surround.
Before
AfterSheetrock & Ceilings

Ceiling before repair, with peeling texture and water damage.

Hallway ceiling before repair, with water stains.

Ceiling before repair, with a hole and exposed insulation.

Ceiling before sheetrock repair, with an opening into the joists.

Ceiling repair in progress. Patches are taped and mudded, not finished.

Textured ceiling corner next to a flue and painted brick.
Cleaning

Exterior window cleaning at a two-story apartment complex with light gray brick and green siding.

Exterior window cleaning at an apartment complex, with a ladder at an upper window.

Close view of a window during exterior window cleaning at an apartment complex.
Bathrooms & Reglazing

Bathroom wall before repair, with water damage and open sheetrock.

Sheetrock patch beside a white vanity, in progress.

Sheetrock opened behind a toilet, in progress.

White vanity with a black faucet.

Bathroom with a white toilet and a white vanity.

Bathroom with a black granite vanity and a vessel sink.
Painting

Exterior painting in progress: porch, columns, railings, and siding painted white. Supplies are still on the walkway.

Exterior painting in progress: porch, railings, and trim painted white. A window is still taped.

Apartment living room painted gray.

Bedroom with gray walls and white closet doors.

Brick fireplace and mantel painted white. The firebox opening is still covered.

Kitchen cabinets painted white, with one door still unpainted.

Hallway with floors covered and doors taped during painting.